Free Site Visit • Free Consultation • Free Savings Report • Limited slots this week
Agra First Focus

Rooftop solar for Agra, done properly.

Founder-led installations, Tier-1 components, honest pricing, and both subsidies (PM Surya Ghar + UPNEDA) handled end-to-end.

Fast Quote

Check Your Savings

Share your details and get a customized solar expert consultation.

Or WhatsApp us directly

Why We Are Agra-First

We are deliberately keeping our service area tight while we build the operation. Every Agra customer in our first phase is on a project the founder personally walks through — site visit, design review, commissioning. That is the honest version of "premium service" in our first year.

Direct Founder Oversight

No middle-men. You speak to the person who designs your system personally.

Dual Subsidies Handled

We file both Central (PM Surya Ghar) and State (UPNEDA) documentation.

Indicative Pricing in Agra

3 kW SystemPopular
₹77k – ₹97k

Effective Net Cost (after ₹1,08,000 combined subsidy)

5 kW System
₹1.77L – ₹2.02L

Effective Net Cost (after ₹1,08,000 combined subsidy)

Payback is typically 2.5–3.5 years on the post-subsidy net outflow. Detailed reports shared after site visit.

How to Start in Agra

Follow our simple site assessment protocol.

01. Share Bill
02. Site Visit
03. Written Report
04. Claim Subsidies

Agra Local FAQ

Where is your office located in Agra?+

We currently operate in a lean, founder-led setup. All site visits and consultations happen at the customer's location, which is more useful than visiting a showroom. As we scale, an Agra service centre will follow.

Are you authorised by DVVNL?+

We are registered on the National Rooftop Solar Portal and coordinate net metering directly with DVVNL Agra.

Do you offer AMC?+

Yes, after the first-year complimentary inspection. AMC pricing is disclosed upfront in writing — typical residential AMC is in the ₹2,500–4,000 per year range depending on system size.

How long does the entire process take?+

Site visit to handover is typically 30–60 days, with the variable being DVVNL inspection scheduling. The on-site installation work itself is 2–4 days.